Tuesday, April 2, 2013

My name isn't Mary

and I'm pretty sure I'm not contrary, but I hope my garden grows!

Ok, so, that's sort of a lame intro but sometimes my brain works in lame ways. In any case, I officially started my garden last night!


We bought a kit on amazon that has 72 wells, a tray to hold excess water, a lid to keep in the moisture and a little heating pad to keep the baby plants all warm and happy. Then we bought soil and home depot and all I had to do was put everything together.

First I filled the wells


And then I wet them. (Side note, next time I think I would wet the soil, then fill the wells. It tended to want to float and then I had to add more because the water also compressed it. Took a couple iterations, but I got there)

Then I poked some holes and added seeds


The final step was to set it up in a sunny spot. (Matt even set up a desk lamp later to make sure they get enough sun :) )


No visible growth yet, but we're waiting on pins and needles over here

In other news Matt has been in the garage for two days straight taking it from this:

To this:


No more arch debris and, bonus (!) we can get the cars back in it. It looks amazing and now we are all reset and ready to get back to work.

Monday, April 1, 2013

Our kitchen is made of dominos

And they are all starting to fall... As we begin to think about getting the kitchen fully in order, Matt and I have realized some things. First is the order of operations. Now, we got all the marble and tile for the backsplash a while ago, but when we started thinking about putting it up we realized that we'd really like to refinish the counter before we do the backsplash. I mean, you'd hate to get paint on the marble tiles. Then, in true "give a mouse a cookie" fashion, we realized that if we were going to do the counter, we'd need to replace the sink. And if we were going to replace the sink, well, we might as well get a new faucet.

So, we've been perusing amazon. Found a couple sinks we like, this one being the current front runner:


And for the faucet, this snazzy moen:


To top everything off, I also order a sample outlet plate and some hooks to put in the closet. The faceplate is a go, I'm going to order some more this week. The hook we still want to try out and make sure it's big enough to hold coats, but I think it will work out alright


Gotta get all our ducks in a row :)

Thursday, March 28, 2013

It's getting hot in here

So time for a new thermostat! Ok, so really, there was no problem with the old thermostat, cept, well, it looked like this. And while we do love a good blast from the past, we like saving energy more


Now, you might know that in our house we have radiant heat from a water boiler system. It's super cool for a couple reasons, one being that since there is no forced air, it doesn't get as dry in the winter and it doesn't spread allergens throughout the house. The second cool thing is that we have zoned heat. That's right, the kitchen, familyroom/master bedroom, and upstairs are all in thier own zone. Now, the downstairs already have cool programmable thermostats, but for some reason the upstairs was stuck in the 1970s. Not really a problem, but not ideal since James has to remember to turn it down every day before going to work. So, yesterday, Matt and James decided to take matters into their own hands. 

First the removed the thermostat bits 


And then disconnected what was left and removed that (notice the blast-from-the-past wallpaper. Apparently the previous owners have a thing for leaving wallpaper behind)


Next they hooked up the new plate:


And put on the cover


Took less than 15 minutes, which I think is pretty impressive, don't you?

Thursday, March 21, 2013

Little improvements

Well its been a busy week for both of us at work, which cut back a little on us working on the house, but we did manage to do a couple things each to keep some of our projects moving.

Matt began repair work on the header over the stairs which had to be sacrificed during move in to get a box spring up the stairs. Matt had cut some interesting pieces of wood to fill the gaps because we misplaced a couple of the pieces

The before

and another before angle


 Matt showing off his carpentry skills


That's right, he cut that triangle from a 2x4! Pretty slick considering we have no experience in carpentry except for the arch

 Adding back in the piece that we did have and you get pretty close to what it used to look like


 Well, except from this angle. Obviously we still have some plaster work to do before we call it done.


Then, he also started working getting the kitchen ready to tile. A while back I put up mud and spackle to seal up all the holes in our new dry wall. Matt, being the smart man that he is, bought a new, vaccum attached, sander. It worked pretty well and kept a lot of the dust out of the kitchen. While he was doing this, I sanded the butcher block down (you can see the edge there in the first shot)


Here Matt is giving the vacuum attachment the tried and true "paper towel" test. It passed.


And it worked pretty well on the walls too.


And last but not least a finished shot of the butcher block after sanding with two different grits and conditioning overnight. Came out pretty sexy if you ask me.


Monday, March 11, 2013

Back at it

Well, here we are, just a couple days after the wedding and we're chomping at the bit to get back to work on the house. Last night we even put together our new bench (courtesy of a yet unknown guest at the wedding since it arrived without a card. We'll have to do some sleuthing there.)

See the unruly before

And the vastly improved better:


It went together pretty quick. Even Leroy got in on the action:







Today Matt and I took a day off and after a lovely breakfast with my parents, went looking at antiques. We've got a few purchases in mind, including an armoire for the bedroom. Didn't have any luck but we did see some cool things and talk to some interesting people.

Then, we took a trip to target and although we only went for hair gel and photo corners, we came back with a couple new lights!


You can see Matt there all tuckered out from our lovely day (ok, maybe the wedding two days ago also played a role in the zonk out...). Its a vast improvement from our old lamps.

AND, to top off all the fun, our kitchen looks like a flower explosion! I totally love it, but I think Matt's going to want our counters back at some point.




Sunday, March 10, 2013

Leroy missed us and the house did too

So some of you might know, but Matt and I got married this weekend!


More pics to follow at some point (and thanks to Mark for this one!). We had an awesome time and couldn't have asked for more. (Notice the arch in the background. Turned out pretty great, right?)

Of course while we were doing this, we were not at the house.Which meant poor Leroy was home alone for most of the weekend. He's a pretty social little guy and he gets upset when we leave him alone too long. And to show his displeasure, he occasionally leaves us "presents" outside the litter box, which we lovingly clean up because times when he does things like this





make up for his little indiscretions.

However, this time, I think he's gone too far. The house is now following his lead. We left it alone for two days and came back to this:



That's right, the door voided its core all over our front porch.




Ok, so what really happened is that the bottom plastic cap/strip which protects the core got some water in it, which turned to ice, which split the plastic, which caused the door not to shut right. So, Matt pulled the strip off a few weeks ago not realizing that with the melting snow, the core of the door would get wet pretty far up and well, this would happen. Although, I still prefer the "our house missed us so much it pooped itself" theory...



Tuesday, March 5, 2013

Painting in the basement

Well the arch is built, but the pressure treatment on the wood leaves slightly less than desirable green streaks throughout the wood. So Matt and I decided we would paint it, but with the below freezing temps, the garage was out of the question. Luckily, we have a basement that stays a lovely 60-65 all day. So once the wood had dried out a bit, we took it downstairs and got to work.



In the past two days we've completed the top and one of the sides, just have one more side to go tomorrow and we should be good to go. It takes 48 hours to dry, so finishing up tomorrow should be perfectly good to move it Friday!